Waste stacking phase |
![]() |
This photograph shows drums of waste stacked in concrete cells at the CSA waste repository. When a layer is full, the gaps between waste packages are filled with mortar, in cells containing metal drums, and with gravel in cells containing cement-filled drums. |
![]() |